28-10-08 Nearly there...

Two weeks ago we decided that enough is enough. Enough of the poor workmanship, enough of the slow response time to get things done, and enough of our house looking almost the same, week after week after week from our first PCI. We wrote to PD informing them in no uncertain terms, our issues and concerns with our new home, suggesting to them that maybe they should get someone out there to see for themselves what was going on. We also advised that we didn’t believe that our house would be ready for our second inspection by Oct 26th which had been suggested by ‘F’, because our house was so far off being completed, and it was so plain to see. We pointed out that we just basically expected a lot more progress on our house, 4 weeks out since the first PCI.

Within half an hour of sending the email, I received a call from the Construction Manager 'M', two up from 'F'. He was very apologetic and explained that they would have someone out there that afternoon. Two hours later, I received a call from 'T', 'F's boss, who had gone onsite. He too was also very apologetic and advised us that he would be taking over to manage the remaining issues and finalise construction. 'T' was basically shocked to find what condition our home was still in and agreed that there was no way the house would be ready for at least a few more weeks!

Since then, ‘T’ (who I might add has been fantastic) has come back to us with a schedule to rectify the remaining issues and is trying his best to have the house ready for our second PCI on Monday the 3rd Nov. Then, based on no major defects appearing, we should have handover on Friday 7th Nov. This date will mark 232 days (or 33 wks) since site scrape. Not an anniversary we want to celebrate.

On top of the existing list of issues and defects found by ‘K’ and us, ‘T’ has determined that several other areas around the house were not up to PD standard and has requested that additional works be carried out to bring them up to scratch. We are glad we are now much closer and on our way to a beautiful house and feel confident that the house will be at a much higher standard then what it would have been had we not escalated the issues. Having said that, we still can’t help feeling disappointed with most of the process pre-escalation and still feel a little ‘bitter’.

As a consequence of the situation, our moving plans have been thrown into disarray by the constant delays. We had allowed ourselves a 7 week buffer from the original (supposed) handover date to move out, but it appears that this wasn’t enough and PD will use up every single day of those 7 weeks. Work has been really good about the situation and understanding of the delays and my need to keep postponing my leave. We must also thank Andy and Tony, our carpet layer and sparky for constantly adjusting their schedule to accommodate our delays week after week. We have had to tackle some interesting logistics with the move process we have been forced into which has been documented so we can track who, when, how, where etc…. But we won’t bore you with that stuff. We can see a light at the end of the tunnel; it just may need some more batteries.


As part of the additional works being carried out, they have ripped up and replaced the balcony deck as the boards were laid to close together, resulting in little or no gap for drainage.


Extensive guttering has been replaced around the house (more than what we had suggested) mainly due to scratches/dents during the build.


The 'z' flashing along the outside garage wall (which sits in between the top of the brickwork and the Gutter) has also been replaced. The flashing has to be sitting either vertically or leaning away from the building to deflect any water - ours was leaning into the wall creating a water trap.


The Plasterer has now finished patching up all the walls - this one three times.


This section of cornice has been re-done 3 times.


The tiles around the nib walls have been ripped out and replaced.



The tiles near the Rumpus entry have been ripped up and replaced to float them higher and decrease the gap below the door, as there was a slight valley near the entry.



As part of our inspection we realised that they had forgotten to install the front door 'reed switch' as part of the Alarm install. They have now included the switch along with a few more holes.


The brickie has now finished off all of the weep holes and flashing above the upper storey windows.




The cleaners have done a once over and the painters are due to start today. A second clean will then be carried out before our 2nd PCI on Monday.

Sorry for the long post, but a lot has transpired in recent weeks.

27-07-08 Paint and Feature walls

The painting is almost complete. We are SO happy with the wall colour that we have chosen (Chalk Beige 1/2 strength), and glad that we renegged on our original choice of 'Bone'. A few more coats of paint on the stairway handrail and other bits and pieces, and it should be done.

When we rocked up, we were surprised to see that they had cement bagged the balcony in preparation for the render to go on!


The feature walls have been done in the study as shown below. The colour is 'Donkey' in case you were wondering.

The two walls of the master bedroom have also been painted. This time we chose 'Ranch Mink'. A little dark at first glance but once you fill the room with furniture and and add some carpet, it will blend beautifully. We saw this colour at another two storey PD display (not a Cremorne 41) and loved it!

The rear facing wall of the house has also been painted, in 'Sandbank', a little darker than the paperbark gutters/windows for contrast.

Here is the Balcony from the side...

...and here it is from underneath. Not sure what they intend to do with the boards - whether they will stain/treat them with anything?

In the garage we have noticed some crappy timber work and will expect that they will fill and re-paint this section.

In the rumpus we discovered a gapping hole in the ceiling where the frame seems to have given way. I think the chippy may need to return.

Lou discovered something about our ensuite as well. Our ensuite cabinet is 700mm high as seen below...

...our plans say that it should be 865mm!! That's 160mm shorter than what the plans say. Maybe Ok if you're a midget....


It seems they haven't learnt from B&Ps experiences?

http://www.perryr.com/homeblog/2008_05_01_archive.html

6-7-08 Doors, Stairs, Shelves and Benchtops

Well its been a busy week in the house. The 'Fix' carpenter 'Steve' has been flat out installing stairs, fitting shelves, hanging door frames and doors, and installing the skirting and architraves.
The outside of the house hasn't really changed much apart from the front doors. One of the 'final' front doors has been installed, but I think he ran out of time before installing the second one.

On Friday morning I caught up with Steve and dropped off a Gainsborough 'Tri-lock' to replace the existing lock we had chosen for the front door. We were originally swaying to have a Tri-Lock as part of contract but the sales consultant at Hopetoun was not too savvy when it came to explaining the unit and we decided not to include it. Then later when we saw 'B&P's' comments we realised it would have the features we wanted so decided to ask 'F' if he could get it fitted for us which he kindly agreed to.

Shown below is one of the front doors fitted with the frosted glass to match the side lights.


The plasterers have finished the house and also included the Shower niches in both the Bathroom and ensuite.


The Plumber has also been back and rectified the issue with the washing machine taps. They have now been tucked inside the cabinet out of view. A bit of spak-filla over the hole and she'll be right mate! ;-)


Our stairs have now been installed and don't the kids love it! up and down, and up and down....




And here is a shot of the under-stairs storage area (AKA - the kids cubby)



Our balcony deck has been laid as well, and here we can see the cherubs conducting some stress testing. You'll also note how dusty they are? The place is a dust bowl - everything you touch has a layer of plaster dust on it.



As part of our variations we asked for the step height of the balcony deck to be raised up so that the cherubs wouldn't have to step off too deeply. You can see by the height in the picture below that the difference now is around 10mm or so - very happy with that.



All of the shelves have been added as well in all the cupboards, WIR and WIP as shown below.



And to our excitement so had our Quantum Quartz bench tops. The colour looks a little darker in this light but once all the paint is on and the place is cleaned up it should look beautiful. I have lifted off the protective chipboard for this shot.



Our kitchen sink has been dropped in place and the vanity units for the ensuite and B'room were both sitting in the family room waiting to be installed.



And finally here is the entrance to the rumpus room with the two doors added to minimise the sound. I may need to later update these to solid doors ;-)


8-06-08 Scaffolding removed and new addition

Well its been a week now since the pre-plaster inspection was carried out and a few things have happened. The scaffolding has been taken down and the bricks have been cleaned and they have a come up a treat.
(Looking at our temporary fencing, we often wonder what purpose it serves if it's constantly OPEN!!).

We are having the balcony rendered so the finish on it was not as tidy as the rest of the house.



The pic below shows the additional beam that has been added (the centre one). This was an item that 'K' picked up as being 'missing'. 'K' had been out to another Cremorne the week before and picked up the same missing beam(this is not just a noggin, its an entire load bearing structural beam!!) . Something that BSS didn't pick up.
The Steel bracket that you see it bolted to was a part of the original 'I' beam but nothing was attached to it. The 'I' beam is purpose-made and no one had picked up that it didn't have anything bolted to it - scary.

The chippy was out on Saturday and on top of rectifying some of the issues 'K' had picked up around the place, he has also erected the garage roof trusses...


... and installed the frame for the balcony deck. We have asked for the level of the deck to be raised a little, as we felt the step down would have been too big for the cherubs (and us after a few drinks). There is now only a 40mm step down to the deck.


The decking timber has also been delivered

I also took the opportunity to take home some of the remaining bricks so they don't get removed. We hope to get Brian the 'brickie' back to build us a matching letter box after handover.

All in all it's been a really great week with the unveiling of the house now that the scaffolding has been removed. Our week became even better than great by weeks-end though, because on a more personal note we were very excited to welcome into the world a new Little addition to the family, our niece, Lola Eve - Born Thursday 5/6/08 at 11.40pm Yippee!!

Just adorable - and here she is, less than 12hrs old.