Alf was a nice and talkative bloke, originally from Germany, who said he was doing work for PD all over the place, from Pakenham to Mernda. He said the poor weather of late had been playing havoc with his schedule and hence why he was out here on a Sunday!!
You can see in this picture that they have had to rebate the gutter in line with the wall as we have built right on the fence line. All the external wiring has been installed across the front and sides
The pile of studs laying here is the timber they had to replace as the water pipe holes had been drilled too closely according to the building code and could weaken them as they are load bearing walls.
The problem with the picture below is that Yes they have replaced all of the studs and spaced out all of the hoses appropriately but they have located the Washing machine taps in the ‘old’ location high on the wall rather than within the cupboard space as we had asked ‘F’ a few weeks ago. I spoke to ‘F about this, this morning and the plumbers were coming back out today to move them again!
Plasterers are due out tomorrow to commence installing the pre-fabricated bulk heads. I have also finally organised a time with ‘F’ to catch up tomorrow arvo and go over ‘Ks’ report and what has been done based on the issues. Not much else has been done but I expect a fair bit to start rolling this week with the plastering.