17-06-08 Bulkhead installation

Met up with 'F' finally. He and I went through 'K's list of issues and he explained what had been rectified, what was still outstanding and that he was still waiting for a report from the PD engineers regarding some of 'K's findings to determine if some of the issues actually needed to be rectified based on the design of the house.

Today the plasterers had been out and started on the pre-baricated bulkheads and wall corners. You can see here the 300mm entry bulkhead which we have included.


Here is another angle of the entry/corridor...


This is the fridge and kitchen bench cavity...


And here is the laundry upper floor waste void...


...and finally the Master WIR.