We caught up with some neighbours on the weekend who said that they saw plasterers in the house on Friday at 5am!!
There's lots of pics so Enjoy.
The image below shows the entry bulkhead all plastered up.
Here are our stairs already to be assembled on Wed. (I'd hate to see the instructions)
Here is our vanity unit with the additional cupboard doors we asked for. We are getting a flick-mixer, hence why you can't see any pipes sticking out from the wall.
Our Kitchen has now been installed - Yea! This is our walk-in-pantry with the additional cupboards and laminate bench top.
Here are some of the cabinets between the fridge alcove and the WIP. The depth of the overhead cupboard in this photo is too shallow. We asked for the top cupboards in this alcove to be an additional 100mm deeper (420mm instead of 320mm). Already been onto 'F' and he is going to have it rectified.
Here is the island bench minus the bench tops (they go on a lot later).
Here are the other wall cabinets and space for the oven and rangehood.
Our down pipes have also been installed.
Here are our laundry cabinets. You'll note that the washing machine stops have been plastered in and they are still in the wrong location!! Should be interesting to see how the plumbers fix this one.
Here is the additional bench and Overhead cupboards we included.
Oh, and here is the additional 'nib' wall we added to the end of the kitchen for those who are interested.
No comments:
Post a Comment